SPUR senior capstone
SPUR: thermoelectric energy-recovery test rig
Used here
- Drawing packages
- Shop fabrication and assembly
- Test rig assembly
- SolidWorks
- Ansys (fluid-simulation setup)
- LabVIEW DAQ (mentor-guided)
- MATLAB
Role
Led a 3-person team through the rig's design, drawings, fabrication, assembly and testing.
Problem
Investigate whether thermoelectric generators could recover waste heat from metro braking.
Constraints
- A limited project budget and capstone schedule.
- Simulation setup and constraint issues that could not be resolved within the available time.
What I did
- Developed test-rig designs with input from the school machinist and evaluated material and cost trade-offs with a teammate.
- Produced the drawing package for the school machinist.
- Fabricated and assembled nearly all of the rig; completed stock cutting, press fits, deburring and finishing.
- Worked on Ansys fluid-simulation setup, then used SolidWorks to inform the initial design.
- Built LabVIEW data acquisition with mentor guidance and plotted test results in MATLAB.
A decision
- Chose
- Used SolidWorks to inform the initial design.
- Rejected
- Continuing the Ansys fluid-simulation setup within the capstone schedule.
- Why
- Setup and constraint issues could not be resolved within the available project time.
Outcome
Built and tested the initial rig during the August–December 2025 capstone. The team measured voltage and temperature to check for power generation. Further development toward optimization and resizing is on hold for now.
Team
Developed with my capstone teammates (one designed the cover), with design input from the school machinist and mentor guidance on LabVIEW data acquisition.
Disclosure Design and performance details are not shared publicly.